Deep-well drilling rig Mud tank system for Coalfield Geology

Recently one set of deep well drilling rig mud tank system for coalfield geology are ready for delivery for China drilling company. The mud tank system consists of 4 sets of mud tanks, 1 set of shale shaker, 1 set of mud cleaner, 1 set of middle speed decanter centrifuge and pumps, mud agitators, mixing hopper, etc.


The shale shaker model is GNZS594, which is a 4 panel linear motion shale shaker as primary separation of the solids control system, installed 4ea of composite material frame shaker screens on the shaker, the vibration strength is adjustable and up to 7.5G, the deck angle can be adjustable synchronously from both sides during working manually. The total screen area is 2.73m2.


The mud cleaner GNZS594J-2S12N is a combination of desander cone, desilter cone and 4 panel bottom shale shaker, with the same dimension shaker screen with shale shaker.The desander cone and desilter cone acts as the second phase separation and the third phase separation of the solids control system. Two units of centrifugal pump are as feeding pump of the desander cone and desilter cone.
The 4 sets of customized designed mud tanks installed with proper quantities of mud agitator, mud gun, mixing hopper and mud tank accessories, electrical control system.


The middle speed decanter centrifuge GNLW452 acts as the fourth phase separation equipment of the solids control system, the separation cut point is 5~7 microns.
As one of the solids control system manufacturer for drilling rigs in China, GN solids control can design and produce complete mud tank system with all the solids control equipments, if you need a mud tank system for oil and gas drilling, geothermal drilling, core bed methane drilling, water well drilling, horizontal directional drilling, coalfield geology and other types drilling, pls contact with GN Solids control.

 

5 sets of Trailer Mounted Mud Tank for Middle East Client

Recently 5 sets of trailer mounted mud tank are ready for shipment to Middle East client. The design is customized for mobility of mud tank system when the user need to move it from one site to another in short time. The advantages of trailer mounted mud tanks including:
1. Easy and convenient movement, fast deployment


2. High quality raw material is applied for better durability and reliability, especially in high ambient temperature area and harsh conditions.
3. Automation system is adopted to monitor and control the mud recycling system better
4. GN can provide complete mud recycling system and equipments, electrical control system and other customized requirement for our client, we can produce a full range of solids control equipments, such as linear motion shale shaker, mud cleaner, desander, desilter, decanter centrifuge in different sizes. This will help the client to get an integral solution for mud cleaning and recycling.


5. It is compatible with different types drilling fluids, as water based drilling fluids, oil based drilling fluids, and suitable for different drilling conditions.
6. Cost saving, high efficiency, easy operation, small footprint
7. With the mud recycling system operation, the drilling waste can be reduced extremely, the used drilling fluids will be reused sufficiently, the coarse solids will be separated out to keep the mud specific in proper way, reduce the impact on the environment.


Except for the trailer mounted mud tank system, GN solids control also design and produce customized oilfield skid mounted mud tank system and drilling rig solids control systems, we can also provide separate solids control equipments and shaker screens, like shale shaker, mud cleaner, desander, desilter, vacuum degasser, mud agitator, mud gun, centrifugal pump, decanter centrifuge, mixing hopper, various transfer pumps, drilling waste management equipments. For more information, pls contact with GN solids control.