GN Solids 14000BBL Rapid Liquid Mud Plant for Drilling Fluids Company

GN Solids Control shipped one set of 14,000 BBL Rapid Liquid Mud Plant to a professional drilling fluids company recently, delivering a flexible, high capacity solution for large scale drilling operations. This system exemplifies GN’s capability to engineer robust mud storage and handling systems that meet the rigorous demands of modern drilling projects.

API-650 Design Standard

The mud plant is engineered in full accordance with API650, the American Petroleum Institute’s widely recognized standard for welded steel tanks for oil storage. This design specification ensures structural integrity, durability, and safety, making the storage tanks suitable for long term field service under demanding drilling conditions.

CSC Container Certification for Global Transport

Each mud tank is configured as a 40ft high container with a capacity of 440 BBL per tank. A key feature of this mud plant is its CSC (International Convention for Safe Containers) container certification. It enables intermodal transport compatible with standard ocean freight and land based container transportation workflows. The containerized design allows equipment to be rapidly mobilized and deployed across different drilling sites, making it particularly suitable for projects where site conditions and equipment locations change frequently.

Double layers Stacking for Space Optimization

To maximize the utilization of limited site space, the mud tanks are designed for double layer stacking. This configuration significantly reduces the overall footprint while maintaining the required storage capacity, offering drilling fluid companies greater flexibility in site layout.

Summary of Key Specifications
Total Capacity 14,000 BBL
Design Standard API-650 (American Petroleum Institute)
Transportation Certification CSC Container Certification
Tank Configuration 40-ft High Cube Container
Capacity per Tank 440 BBL
Stacking Design double layer stackable

With its substantial storage capacity, containerized structure, certified transportation design, and space saving configuration, the 14,000 BBL Rapid Liquid Mud Plant provides a reliable and efficient solution for modern drilling fluid management and rapid deployment requirements.

2600BBL! GN Complete Rig Solids Control System to Kuwait

GN Solids Control is pleased to announce the successful order of a complete rig solids control system for a 2600 BBL drilling operation in Kuwait. This milestone order marks another significant step in GN’s deepening partnership with the Kuwait oil and gas sector, transitioning from supplying individual equipment to delivering comprehensive, full-system solutions.

default

1) From solids control to mud system, GN secures another full-system order from Kuwait.
This order represents a comprehensive turnkey mud processing solution, integrating all key components required for efficient drilling fluid management. The fully loaded system includes:
Shale Shaker – the first phase solids separation solids control equipment
• Desander – Secondary separation of medium-sized solids
• Desilter – Fine solids separaton
• Vacuum Degasser – Removal of entrained gases
Drilling fluids Decanter Centrifuge – Fine and ultra-fine solids separation


2) As a KOC (Kuwait Oil Company)- approved solids control manufacturer, GN delivers total mud processing solutions.
3) System integrates shale shaker, desander, desilter, vacuum degasser, and decanter centrifuge – fully loaded.
4) ATEX-certified electrical controls, tailored for Middle East’s harsh conditions.
Recognizing the extreme operating environment of the Middle East, the system is equipped with ATEX-certified electrical controls. This certification ensures safe and reliable operation in potentially explosive atmospheres, a critical requirement for oil and gas facilities across the region. The ATEX-rated components, combined with robust engineering, make the system ideally suited for Kuwait’s demanding desert conditions — where high temperatures, dust, and stringent safety regulations require equipment of the highest standard


5) The 2600 BBL complete drilling rig solids control system order from Kuwait reinforces GN Solids Control’s position as a leading provider of total mud processing solutions — from individual solids control equipment to integrated, turnkey packages that boost drilling efficiency and safety worldwide.
For more information about GN’s complete rig solids control systems or KOC-approved solutions, please contact GN Solids Control’s sales team.

ATEX and CE Certified Solids Control System for Europe Client

Recently one set of ATEX and CE certified solids control system are ready for shipment to Europe client.


A complete solids control system including mud gas separator, drilling fluids shale shaker, mud cleaner combo unit ( desander, desilter, shale shaker), vacuum degasser, decanter centrifuge, feeding pump, mud agitator, centrifugal pump, mud tank system and explosion proof electrical control system. When this system carries both ATEX and CE certifications, it signifies compliance with stringent European Union regulations for safety and performance.


CE Certification
The CE mark is the manufacturer’s declaration that the product meets all applicable EU health, safety, and environmental protection legislation (known as EU Directives). It is mandatory for products sold within the European Economic Area (EEA).
ATEX Certification (The Specific Hazardous Area Requirement)
ATEX derives from the French “ATmosphères EXplosibles.” It refers to two key EU Directives governing equipment for use in potentially explosive atmospheres:
Why it’s crucial for Solids Control: Drilling fluids release hydrocarbon gases (methane, etc.). These gases can mix with air inside tanks, pits, and equipment, creating a potentially explosive atmosphere (Zone 1 or Zone 2). An ATEX-certified system is specifically designed to prevent ignition.
An ATEX and CE Certified Solids Control System is not just a high-quality piece of industrial equipment; it is a safety-critical, legally compliant system engineered to operate safely in the high-hazard environment of drilling operations where explosive gases may be present. It represents a significant investment in risk mitigation and regulatory compliance for any drilling contractor operating in demanding regions.


Except for oil drilling mud solids control system, GN also produce shaker screens, drilling waste management equipments, oil sludge treatment system, TBM & construction slurry separation plant, HDD mud recycling system and mining tailings treatment equipments.
If you need a customized solids control system, pls contact with GN solids control.

 

2000HP Drilling Rig Solids Control System for Indian Drilling Company

Recently one set of 2000HP Drilling Rig Solids Control System for Indian Drilling Company, this is the repeat order from the drilling company, they already purchased one set of 3000 HP rig solids control system. The features of the 2000HP rig solids control system including:


1. Single mud tank modular is interchangeable for both 2000HP mud tank system and 3000HP mud tank system, which allow the client to use it flexible for different projects.
2. The solids control equipments are interchangeable for both 2000HP solids control system and 3000HP solids control system, including the voltage/frequency/model/specifications, so the client can replace them if required.
3. The cable wiring connection and design is also interchangeable for both system.


The technical configuration of the 2000HP rig solids control system is as below:
1. Mud gas separator GNZYQ1200A, 1 ea
2. Drilling fluids shale shaker GNZS594K, 3ea
3. Vacuum degasser GNZCQ270B, 1ea
4. Linear motion mud cleaner GNZJ594K-2S12N, 1ea


5. Mud mixing skid, including 2ea mixing hopper, 1 ea jet shearing unit and 2ea of 100HP mixing pump , which is connected to mud tank, it can suck from any compartment to mix the drilling fluids and also discharge to any of the compartment.
6. Mud tank system with pipelines, accessories, fittings, including shaker tank, intermediate tank, suction tank, trip tank, pre-flush tank, 3ea reserve tank, 3ea water tank, the total volume can meet the client’s requirement.
7. feeding pump of Desander, desilter , 2ea
8. Decanter centrifuge with feeding pump


9. Mud agitator and mud gun with proper model and qty for all the mud tanks to meet the requirement
10. Lightings and ATEX explosion proof electrical control system for the whole solids control system
If you need a good quality, good performance drilling rig solids control system, pls contact with GN solids sales.

Multiple sets of drilling rig mud tank systems have completed installation and commissioning work

Multiple sets of drilling rig mud tank systems have completed installation and commissioning work. The drilling rig mud tank system including shale shaker, desander, desilter/ mud cleaner, vacuum degasser, decanter centrifuge, trailer mounted mud tanks with tank accessories and roof cover, centrifugal pump, mud agitator, mud gun, etc.

As per client’s request, GN engineer will fly to client’s rig site to complete the installation and commissioning work. The installation and commissioning work including:
1. Functionality Check: Ensure that all components of the mud tank systems are functioning correctly. This includes mixing equipment, pumps, shakers, and other related machinery.
2. Safety measures: Verify that all safety measures are in place and that the systems comply with relevant safety standards and regulations.


3. Operational Training: Make sure that the crew is adequately trained to operate the new systems. This includes understanding the controls, troubleshooting common issues, and emergency procedures.
4. Environmental Compliance: Ensure that the mud tank systems are equipped to handle waste management and comply with environmental regulations to prevent any spillage or contamination.
5. Documentation: Complete all necessary documentation, including installation reports, commissioning certificates, and operational manuals. This documentation is crucial for future reference and compliance audits.
6. Maintenance: Establish a regular maintenance schedule to keep the mud tank systems in optimal condition. This will help in preventing unexpected downtime and prolonging the lifespan of the equipment.
7. Performance Monitoring: Implement a system for continuous monitoring of the mud tank systems’ performance. This will help in identifying any inefficiencies or issues early on and allow for timely corrective actions.


As one of the solids control system and drilling waste management system manufacturer in China, GN Solids Control can design and produce customized drilling rig mud tank systems according to client’s requirement. For more information, pls contact with GN solids engineer.