Workover Rig solids control system shipped to Australia
This week GN shipped one set of workover rig solids control system to Australia. The configuration is as below: 1) Shaker tank with 2 units of shale shaker to clean the drilling mud 2) Mixing tank with mixing hopper, 2 units of centrifugal pump to prepare for new drilling fluids 3) Mud agitator, mud gun, … Continue reading “Workover Rig solids control system shipped to Australia”